Strategic Roadmap
Scaling from software MVP to a physical distributed infrastructure network.
Phase 1 (Active)
The Generative Engine
Development of the core Intent-to-BOM LLM. This software layer enables students to translate natural language ideas into engineering specifications and shopping lists.
Phase 2 (Q3 2026)
Rooftop Dark Labs
Deployment of the first 50 pilot nodes in Mumbai. Each node utilizes 200-500 sq ft of idle rooftop space, equipped with automated 3D printing farms.
Phase 3 (2027)
B2B & Startup Services
Opening the network to deep-tech startups for rapid prototyping. Offering "Manufacturing-as-a-Service" API for programmatic part fabrication.
Phase 4 (Long Term)
Community Grid
Decentralized science projects utilizing the distributed node network (e.g., urban weather monitoring, rooftop radio telescope arrays).